Pre-Engineered Building

Applications of PEB

  • Factories
  • Warehouses
  • Workshops
  • Offices
  • Gas stations
  • Vehicle parking sheds
  • Schools
  • Showrooms
  • Aircraft hangers
  • Metro stations
  • Indoor stadium roofs
  • Bridges
  • Railway platform shelters
  • Outdoor stadium canopies

Comparative Studies

A Pre-Engineered Steel Building (PEB) is made of built-up sections, hot rolled sections and cold-formed elements, which are designed and manufactured at Buildtree’s state-of-the-art factory and then transported to your new Industrial Shed’s site for bolting and erection. We custom design and engineer your Industrial Shed such that you save your cost of civil construction and also begin your operations at the earliest.

Evaluation Criteria PEB Building Concrete Building
Fabrication Precise fabrication: Members fabricated in a controlled environment and up to 50% saving in fabrication time on site. Fabrication done on site; Requires building the reinforcement cage and shuttering work prior to pouring.
Delivery and Logistics Can be delivered in desired sequence anywhere in the world. Might have to build batch plant on site if site is secluded or huge.
Installation Time Saving in construction time. Fast Installation with no idle time. 50% Slow and time consuming: The contractor will have to wait for the previous cast to harden (14-28 days) before being able to cast next batch
Quality
  • Quality of steel is guaranteed because It is a homogeneous product.
  • Pieces are tailored according to shop drawings.
  • Precise machinery is used for fabrication. It is fabricated under shop control.
  • Quality is not affected by weather conditions
  • Many factors lead to quality deterioration Concrete is not a homogeneous product. Concrete mix ingredient ratios are difficult to maintain.
  • Quality of water used may vary.
  • Weather conditions.
  • Labour experience in pouring.
  • Adequate use of vibrators.
  • Using proper curing methods.
  • Concrete shrinkage.
  • High manpower count may weaken control.
Cost Savings of 10%-15% for large span steel building. Gives high return after use. Construction cost is high at site. No return once destruction.
Industrial Applications
  • Saving on maintenance cost: Can easily handle equipment such as multiple cranes within building. Sways can be controlled.
  • Precision can be achieved during Installation.
Heavy equipment usage such as cranes is limited.
Commercial & Infrastructure Applications Better aesthetics and longer spans can be achieved using steel as building component. Limited designs are possible with concrete.